How soon can I use the concrete after it’s lifted?

Right away for foot traffic. The foam reaches most of its strength within about fifteen minutes, so you can walk on it before we’ve packed up. For driveways and anything carrying vehicle weight, we’ll tell you when it’s ready, usually within fifteen to thirty minutes. There’s no multi-day curing wait.